Two water sources mean Bellaire’s supply story cannot be understood by looking at only wells or only surface water.

A large cloud in the sky over a body of waterIllustration

Bellaire's drinking water comes from two systems before it reaches the same tap. In the City's 2025 water report, 52 percent came from the surface and 48 percent came from groundwater. The surface water comes through City of Houston treatment and repump facilities. The groundwater comes from the Evangeline Aquifer, through three wells that Bellaire runs itself.

The split is close to even. The City describes its operating goal as a 50/50 mix of surface water and groundwater. The 52/48 figure is what the report showed for the year.

The short version

  • The City's 2025 water report shows 52 percent surface water and 48 percent groundwater.
  • The surface water comes from City of Houston treatment and repump facilities.
  • The groundwater comes from the Evangeline Aquifer.
  • The City says it operates three underground wells.
  • The City describes a 50/50 mix of surface water and groundwater as its operating objective.
  • Bellaire's public water system identifier is TX1010004.

Two sources

Bellaire does not rely on one supply. It uses water that is treated elsewhere and sent to the city, and it uses water it pumps from the ground.

The surface-water share is reported as coming from City of Houston treatment and repump facilities. The 2025 report puts that share at 52 percent.

The groundwater share is 48 percent, and the report names the Evangeline Aquifer as the source. The City's Water Production page says Bellaire has three underground wells.

Two sources means a backup. A change on the Houston side and a change at a city well are not the same thing, and a city with both has more than one way to keep water in the pipes.

Reading the 52/48 split

The report's note matters. The percentages are the source mix for the report year. They are not necessarily the same every day. A day with more well water would show a different split from a day with more Houston water.

The City's 50/50 mix is a separate thing. The Water Production page describes it as an operating objective, not as a measured annual result. So the city is aiming for an even split, and in the 2025 report it landed two points off, on the surface-water side.

That is a small gap. It is also a good example of why an aim and a result should not be confused.

Who watches the water

Bellaire's public water system identifier, assigned by the Texas Commission on Environmental Quality (TCEQ), is TX1010004, as printed in the 2025 report. It helps you match the City's report to state records.

The City publishes a Drinking Water Quality Report each year. The source mix is in it, along with the system identifier.

What water costs

The City's FY2026 rates took effect on October 1, 2025. They include a fixed monthly water charge of $13.19 for a small meter. In addition, the first 5,000 gallons are billed at $3.85 per 1,000 gallons. The highest displayed tier, for use of 20,001 gallons and up, is $13.53 per 1,000 gallons. The City's fiscal year 2027 began October 1, 2026, so check the City's current rate sheet for the amounts on a bill you receive now.

The rate sheet is built so that heavier use costs more per gallon. The highest displayed tier, $13.53 per 1,000 gallons, is about 3.5 times the $3.85 rate for the first 5,000 gallons. That is simple arithmetic from the two posted rates. In dollars, the first 5,000 gallons of a month cost $19.25 in water use, while one extra 1,000 gallons past 20,000 costs $13.53.

The rate sheet does not say how much of each charge goes to the wells or to the water bought from Houston, so cost and source cannot be tied together from the public pages. The tiered rates tell you the price rises with use. They do not tell you which source supplied the water.

Upgrades under way

Water supply also depends on pipes. The City's Priority Waterline Replacement project, called WA2205, showed a total project cost of $5 million on the City's project page in late September 2026. The page listed the project in construction and gave an estimated completion date of August 11, 2027. The City marks both the cost and the date as subject to change.

Voters have also approved money for the water system. Proposition B, which passed on November 5, 2024, authorized $30 million for water and wastewater facility improvements.

What this means for you

If you want to know what is in your water, start with the City's annual Drinking Water Quality Report and look for the source mix and the system identifier TX1010004. Ask the City which source is serving your part of town on a given day, since the yearly percentages are an average of the year and not a daily reading.

Sources

  • City of Bellaire: 2025 Drinking Water Quality Report (https://www.bellairetx.gov/DocumentCenter/View/35516/Bellaire-Water-Quality-Report-CCR-2025-PDF)
  • City of Bellaire: Water Production (https://www.bellairetx.gov/636/Water-Production)
  • City of Bellaire: FY 2026 Utility Rates - Effective October 1, 2025 (https://www.bellairetx.gov/DocumentCenter/View/34539/FY-2026-Utility-Rates-PDF)
  • City of Bellaire: WA2205 - Priority Waterline Replacement (https://www.bellairetx.gov/1992/WA2205---Priority-Waterline-Replacement)
  • City of Bellaire: Water/Wastewater Projects (https://bellairetx.gov/1938/WaterWastewater-Projects)

Ours to fix

Something wrong on this page? Something we should add?

We read every one, and we write back when it's fixed.

Your email is only for writing back. Privacy.